Civil Projects

UDOT I-15 CORE

Project Owner: UDOT | Completed: 2012 | Cost: $1.725 Billion

Location: I-15 Lehi Main Street to Spanish Fork Main Street

Project Specifications:

  • Added two lanes in both directions
  • Extended the express lane in both directions from University Parkway in Orem to Spanish Fork
  • Rebuild and reconfigured 10 freeway interchanges and replaced 63 aging bridges
  • Use 40-year concrete pavement along the entire corridor

CMT’s Role: Quality Acceptance

UDOT 12300 SOUTH DESIGN BUILD

Project Owner: UDOT | Completed: 2004 | Cost: $115 Million

Location: 12300 South – I-15, Draper, Utah

Project Specifications:

  • Widening of roadway providing for two additional lanes each direction
  • Single Point urban interchange (SPUI) replacing existing diamond interchange
  • Pedestrian overpass
  • Artwork from the local school was incorporated into the bridge abutments and railings.

CMT’s Role: Quality Acceptance

udot 12300 south design build

UDOT SR 68 DESIGN BUILD

Project Owner: UDOT | Completed: 2009 | Cost: $68 Million

Location: Bangerter Highway at Redwood Road on the North to 400 South in Saratoga Springs

Project Specifications:

  • 10.3 miles of road
  • 250,000 cubic yards of excavation was moved
  • 214,000 tone of asphalt was placed.

CMT’s Role: Quality Acceptance Design and Construction

udot sr 68 design build

UDOT SR 77 DESIGN BUILD

Project Owner: UDOT | Completed: 2009 | Cost: $78 Million

Location: Springville, Utah I-15 Interchange

Project Specifications:

  • SR77 widened to five lanes
  • Overpass structure constructed at 1500 West
  • Single Point urban interchange (SPUI) replacing existing diamond interchange

CMT’s Role: Independent Quality Acceptance

udot sr 77 design build

UDOT LEGACY PARKWAY

Project Owner: UDOT | Completed: 2009 | Cost: $685 Million

Location: North Salt Lake to Farmington – Davis County, Utah

Project Specifications:

  • 14 miles of a new four-lane highway
  • Meandering roadway instead of a traditional fixed, straight highway design
  • Unique bridge monuments and barriers
  • Independent multi-use and equestrian trails alongside the Parkway

CMT’s Role: Quality Control on Parkway in Centerville and Farmington

UDOT REDWOOD ROAD RECONSTRUCTION

Project Owner: UDOT | Completed: 2008 | Cost: $24 Million

Location: 10400 South – South Jordan to 12600 South in Riverton

Project Specifications:

  • Two travel lanes in each direction and a median/left turn lane
  • 10 foot shoulders with a striped 4-foot bicycle lane
  • Raised medians, dual-left turn lanes and right turn pockets at major intersections

CMT’s Role: Quality Acceptance

UTA COMMUTER RAIL

Project Owner: UDOT | Completed: 2008 | Cost: $550 Million

Location: Downtown Salt Lake City Utah to Pleasant View in Ogden

Project Specifications:

  • 44 miles of which 38 miles is new tracks built by UTA
  • 43 at grade street crossings
  • Two bridges; one 1450 foot bridge spanning the Weber River and one 680 foot bridge in the UPRR Ogden Rail Yard
  • Eight stations

CMT’s Role: Quality Acceptance